A safe procedure for loading, chaining and unloading hire plant: site checks, ramps, banksmen, load securing and the records to keep.
Key takeaways
Loading and unloading plant from trailers and beavertails is one of the most dangerous routine jobs in plant hire. Machines can slide on wet or muddy ramps, overturn if they turn on the ramps, or hit people standing nearby. Most incidents happen on customers' sites, where ground and space are unfamiliar.
Line up
Straight with the ramps, tracks centred.
Blade or bucket forward
Following the manufacturer's loading guidance for the machine.
Travel slowly up
Low speed, no turning on the ramps.
Position on the bed
Centred, weight distributed as the trailer requires.
Lower everything
Bucket and blade down, boom locked, engine off, key out.
Check the site
Ground, slope, overhead cables, people and traffic before parking.
Park safely
Level ground, clear of traffic, hazard lights on.
Release chains carefully
Binders can whip under tension.
Drive down slowly
Straight, low speed, with a banksman if needed.
Hand over
Familiarisation, photos and signed delivery note.
FAQs
Keep going
Transporting plant
Trailer weights, licences, O-licences and load securing.
Read guide →
Health and safety for plant hire companies
Policy, risk assessments, RAMS and RIDDOR.
Read guide →
Plant hire pre-delivery inspection checklist
Tick-box checks before every machine leaves the yard.
Read guide →
Employing HGV and delivery drivers
Licences, Driver CPC, hours and tachographs.
Read guide →
This guide is general information for people setting up a plant hire business in the UK. It is not legal, tax, insurance or financial advice. Rules and thresholds change, so check current guidance on GOV.UK and take advice from an accountant, solicitor or broker before acting.